Battery Energy Storage Solution for Hotels
Reduce electricity costs by 30-40% with z ero capital investment .
A proven solution for 5 – star hospitality operations
Overview
Why BESS for Hotels?
Battery Energy Storage Systems deliver measurable financial and operational benefit s for hospitality operations .
Product
MPA-200A
Pump Station Package (E-House)
All-in-One prefabricated solution for pump station automation. Factory prefabricated, FAT completed, plug & play deployment with high efficiency VFD control and PLC + HMI + SCADA integrated control.
Rated Power: 1 – 5 MW
Input Voltage: 6kV – 33kV
Dimensions: 6058 × 2438 × 2591 mm
Weight: 12 – 16 Tons
MPA-200B
Power Plant Automation House (E-House)
All-in-One prefabricated automation solution for power plants. Factory prefabricated with high reliability, 24/7 continuous operation, optimized cooling & fire protection, and easy maintenance with remote monitoring.
Motor Power: 4 × 1800kW
Input Voltage: 6.6kV / 50Hz
Dimensions: 25800 × 7800 × 4000 mm
HVAC System: 3 × 180kW (N+1)
Architecture
3D Layout & Fire Protection Design
3D Fire Protection: Device-Level Components
Sungrow PowerStack ST510CS-4H — Built-in Safety Architecture
Hot aerosol fire suppression canisters auto-activate within 3 seconds of confirmed thermal event.
Fire Response Chain: 5-Stage Protection
Trigger Signal
Cell anomaly, gas, smoke, or temperature rise
System Judgment
BMS / PCS internal sensors confirm event
Local Alarm
Audible sounder + visual strobe activate
Remote Alert
iSolarCloud monitoring & fault diagnosis
Cabinet Suppression
Hot aerosol fire extinguishing activates
Grid Connection
T4 Transformer 400V Direct
Key Advantage: Direct 400V LV connection eliminates the need for a dedicated transformer . BESS connects behind the existing T4 meter — all energy flowsarecaptured by the hotel’ s EVN meter,
ensuring accurate billing and maximum ar bitrage capture.
Backup Power: BESS + Diesel Generator Coordination